AgMIP open source software development and use.
This function allows standard paddy management inputs to be generalized for a field or group of fields.
Sample Paddy function:
The last three could be multiple
! | Dome operator | Variable to be modified | Value or Function | Function arguments | Bund operation #1 | Bund operation #2 | Bund operation #3 | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
! | IRRIGATION VALUE | PADDY function | # of Bund height entries | Percolation rate (mm/d) | Plowpan depth (mm) | Operation date(days after planting) | Max flood (bund) height (mm) | Min flood height (mm) | Operation date(days after planting) | Max flood (bund) height (mm) | Min flood height (mm) | Operation date(days after planting) | Max flood (bund) height (mm) | Min flood height (mm) | |
& | FILL | IRVAL | PADDY() | 3 | 2 | 150 | -3 | 20 | 5 | 4 | 30 | 10 | 11 | 50 | 15 |
IDATE | IROP | IRVAL | ! Comment |
---|---|---|---|
$PDATE-3 | IR010 | 150 | ! puddling, plowpan depth |
$PDATE-3 | IR008 | 2 | ! percolation rate |
$PDATE-3 | IR009 | 20 | ! bund height |
$PDATE-3 | IR011 | 5 | ! target minimum flood level |
$PDATE+4 | IR009 | 30 | ! bund height |
$PDATE+4 | IR011 | 10 | ! target minimum flood level |
$PDATE+11 | IR009 | 50 | ! bund height |
$PDATE+11 | IR011 | 15 | ! target minimum flood level |